Good Day at Methodist Build

Good Day at Methodist Build

It was a good day at the Methodist Build on Saturday December 1. The interior was painted and some siding got installed. Thank you Rick and Kelly Sigler,  Mike and Ben Walsh for coming out to help. And a big thanks to Jolee, Kevin and Ian Stover for feeding us. Thank you to Jeff Cooper for coordinating the effort!